Write a Change Control Notice

Draft a formal change control notice with a clear description of the change, impact assessment on cost and programme, and approval routing.

BeginnerProject ManagerVariation Management

Overview

This workflow helps Project Managers quickly draft a formal change control notice when a variation or change is identified. It structures the notice with all the information needed for the approval process, ensuring nothing is missed.

Prompt

You are a UK Construction Project Manager drafting a formal Change Control Notice. Complete the following change control form:

Project Details:
- Project: [PROJECT NAME]
- Contract Form: [CONTRACT, e.g., JCT Design and Build 2016]
- Change Control Number: [NUMBER, e.g., CCN-024]
- Date Raised: [DATE]
- Raised By: [NAME AND ROLE]

Change Details:
- Change Title: [TITLE, e.g., Addition of acoustic partitions to Level 2 meeting rooms]
- Change Category: [CATEGORY, e.g., Client Change / Design Development / Unforeseen Condition / Regulatory Requirement]
- Description of Change: [DETAILED DESCRIPTION, e.g., Client has requested upgraded acoustic performance to 6 meeting rooms on Level 2, requiring removal of standard plasterboard partitions and replacement with proprietary acoustic rated system achieving Rw 55dB]
- Reason for Change: [REASON, e.g., Client operational requirement — rooms to be used for confidential board meetings]
- Drawings/Documents Affected: [LIST, e.g., Drawing A-201 Rev C, Specification Section 45-20]

Impact Assessment Data:
- Estimated Cost Impact: [AMOUNT, e.g., £18,500 addition]
- Estimated Programme Impact: [IMPACT, e.g., 5 working days additional to Level 2 fit-out, no impact on overall completion]
- Quality/Specification Impact: [IMPACT, e.g., Enhanced acoustic performance, upgraded partition specification]
- Risk Impact: [IMPACT, e.g., Low — standard proprietary system, lead time 2 weeks]

Draft a formal Change Control Notice containing:
1. Change Description — clear, unambiguous description of what is changing and why
2. Contractual Basis — identify the relevant contract clause (e.g., JCT cl. 3.14 Change, or NEC4 cl. 60.1(1) compensation event)
3. Cost Impact — itemised estimate with sufficient detail for approval
4. Programme Impact — which activities are affected, critical path impact, and any float consumed
5. Risk Assessment — risks of implementing the change and risks of not implementing it
6. Approval Routing — table showing approver name, role, and signature/date line for: Originator, Project Manager, Commercial Manager, Client Representative
7. Decision Options — Approve / Approve with Conditions / Reject / Defer — with a brief note on each

Use clear, concise language appropriate for a formal project control document.

Use Case

Use whenever a change is identified on the project that requires formal approval. Input the change details and the AI will draft the complete change control notice ready for review and circulation.

Recommended Tool

Microsoft Copilot

AI built into Microsoft 365. Perfect for construction firms using Word, Excel, PowerPoint, and Teams.

AI AssistantIncluded with M365 Copilot
Learn more →
Try our software

Want these prompts pre-built?

AI Construction Copilot has all these workflows ready to run — no copy-pasting needed. Built specifically for construction professionals.

Try Free